Test Case TC 1.0: Generating Reports Main Scenario
Testing Environment
Actions – See steps in main scenario of Use Case UC 1.0 Input Data
Input Data
Actions – See steps in main scenario of Use Case UC 3.0 Input Data
Actions – See steps in main scenario of Use Case UC 4.0 Input Data
Actions – See steps in main scenario of Use Case UC 5.0 Input Data
Input Data
Actions – See steps in main scenario of Use Case UC 8.0 Input Data
Подобный материал:
1   2   3   4   5

Test Case TC 1.0: Generating Reports Main Scenario

Introduction:

Identifier – TC 1.0

Owner/Creator – Group 7

Version – 2.0

Name – Generating Reports – Main Scenario

Requirement Identifier – UC 1.0

Purpose – Will test to ensure that validated data in BevDot can be used in generating the different reports requested by the various users.

Dependencies – Example data published in BevDot


Activity:

Testing Environment – Test will be performed on BevDot from example information from legacy system.

Initialization – User connected to BevDot via a GUI and request a report.

Finalization – BevDot pulls information from published tables and returns report to the user.

Actions – See steps in main scenario of Use Case UC 1.0

Input Data – Example data that would be found in legacy system.


Results:

Expected Results – User would request a report then BevDot would gather the information and return the report to the user.

Actual Results – Reports were generated successfully with fake data manually entered.


  1. ETL

Test Case TC 2.0: ETL process Main Scenario

Introduction:

Identifier – TC 2.0

Owner/Creator – Group 7

Version – 2.0

Name – ETL – Main Scenario

Requirement Identifier – UC 2.0

Purpose – Test will check to make sure data extracted from legacy system to data warehouse is performed correctly.

Dependencies – Raw data from legacy system


Activity:

Testing Environment – ETL needs to be installed on BevDot

Initialization – Extract data from legacy to begin ETL process.

Finalization – Cleanse data and place into tables.

Actions – See steps in main scenario of Use Case UC 2.0

Input Data – Example data that would be found in legacy system.


Results:

Expected Results – BevDot would extract, automatically validated data, transform, and cleanse data.

Actual Results – Data needed to be validated manually.


a. Extract data from legacy system into BevDot

Test Case TC 3.0: ETL process Extract Scenario

Introduction:

Identifier – TC 3.0

Owner/Creator – Group 7

Version – 2.0

Name – ETL – Extract data Scenario

Requirement Identifier – UC 3.0

Purpose – Test will check to make sure data is extracted from the legacy system into BevDot.

Dependencies – Raw data from legacy


Activity:

Testing Environment – ETL needs to be installed on BevDot

Initialization – Extract data from legacy to begin ETL process.

Finalization – Data finishes transfer and moves to next step in ETL process.

Actions – See steps in main scenario of Use Case UC 3.0

Input Data – Example data that would be found in legacy system.


Results:

Expected Results – BevDot would extract data from legacy system and be ready for next step in ETL process.

Actual Results – Data was indeed extracted from legacy system into BevDot.

    1. Automatically validate data



Test Case TC 4.0: ETL process Auto Validate Scenario

Introduction:

Identifier – TC4.0

Owner/Creator – Group 7

Version – 2.0

Name – ETL – Auto Validate Scenario

Requirement Identifier – UC 4.0

Purpose – Test will check to make sure extracted data is automatically validated.

Dependencies – Raw data from legacy system


Activity:

Testing Environment – ETL needs to be installed on BevDot

Initialization – Extracted data from legacy system will be validated.

Finalization – validated data will go into BevDot to be published into tables.

Actions – See steps in main scenario of Use Case UC 4.0

Input Data – Example data that would be found in legacy system.


Results:

Expected Results – BevDot would automatically validated data from legacy system.

Actual Results – Automatic validation failed and therefore required manual validation.

  1. Transform data to publish into tables


Test Case TC 5.0: ETL process Transform Scenario

Introduction:

Identifier – TC 5.0

Owner/Creator – Group 7

Version – 2.0

Name – ETL – Auto Validate Scenario

Requirement Identifier – UC 5.0

Purpose – Test will that validated data is transformed.

Dependencies – Validated data


Activity:

Testing Environment – ETL needs to be installed on BevDot

Initialization – Validated data will be transformed.

Finalization – Transformed data will be ready to for tables to be published.

Actions – See steps in main scenario of Use Case UC 5.0

Input Data – Example data that would be found in legacy system.


Results:

Expected Results – BevDot would transform the data validated from the ETL process.

Actual Results – Data from validation was successfully transformed.

  1. Publish Tables


Test Case TC 6.0: ETL process Publish Tables Scenario

Introduction:

Identifier – TC 6.0

Owner/Creator – Group 7

Version – 2.0

Name – ETL – Auto Validate Scenario

Requirement Identifier – UC 6.0

Purpose – Test will check to make sure transformed data is in tables and is published.

Dependencies – Transformed data in BevDot


Activity:

Testing Environment – ETL needs to be installed on BevDot

Initialization – Transformed data is put into tables ready to be published

Finalization – Tables are published.

Actions – See steps in main scenario of Use Case UC 6.0

Input Data – Example data that would be found in legacy system.


Results:

Expected Results – BevDot would publish the tables so they would be available from reports.

Actual Results – BevDot successfully published tables.


  1. Manual Validation

Test Case TC 7.0: ETL process Manual Validation Scenario

Introduction:

Identifier – TC 7.0

Owner/Creator – Group 7

Version – 2.0

Name – ETL – Auto Validate Scenario

Requirement Identifier – UC 7.0

Purpose – Test will check manual validation process.

Dependencies – Extracted data from legacy system


Activity:

Testing Environment – ETL needs to be installed on BevDot

Initialization – IT department receives message of failed automatically validation to begin manual validation.

Finalization – Data is validated to begin transformation.

Actions – See steps in main scenario of Use Case UC 7.0

Input Data – Example data that would be found in legacy system.


Results:

Expected Results – IT department would check all data that failed automatic validation to manually validated data.

Actual Results – IT department successfully validated data manually.

  1. Error Handling

Test Case TC 8.0: Error Handling - Main Scenario

Introduction:

Identifier – TC 8.0

Owner/Creator – Group 7

Version – 2.0

Name – Error Handling – Main Scenario

Requirement Identifier – UC 8.0

Purpose – Test will check error handling of BevDot

Dependencies – BevDot system


Activity:

Testing Environment – BevDot system

Initialization – IT department checks BevDot for error handling

Finalization – Errors are handle with the correct responses to errors.

Actions – See steps in main scenario of Use Case UC 8.0

Input Data – Example data that would be found in legacy system.


Results:

Expected Results – BevDot would handle errors with correct responses.

Actual Results – BevDot was successful with error handling
  1. Graphical representations of Reports

Test Case TC 9.0: Graphical Representations of Reports Scenario

Introduction:

Identifier – TC 9.0

Owner/Creator – Group 7

Version – 2.0

Name – ETL – Auto Validate Scenario

Requirement Identifier – UC 9.0

Purpose – Test will check that there is graphical representations of reports.

Dependencies – Published data in BevDot


Activity:

Testing Environment – BevDot system

Initialization – Reports will be gathered

Finalization – Graphical representation of the reports will be printed.

Actions – See steps in main scenario of Use Case UC 9.0

Input Data – Data in BevDot.


Results:

Expected Results – BevDot world produce graphical representations of reports.

Actual Results – Graphical representations were produced.


  1. Section 6.3 Features-to-Use Case




UC1.0

UC2.0

UC3.0

UC4.0

UC5.0

UC6.0

UC7.0

UC8.0

UC9.0

FE1.0

X

























FE2.0

X*

























FE3.0

X*

























FE4.0

X*

























FE5.0




X*






















FE6.0




X

X*



















FE7.0




X

X*

X*
















FE8.0




X

X*

X*

X*













FE9.0
















X










FE10.0



















X







FE11.0






















X




FE12.0

























X


  1. Section 6 Use-Case to Test-Case




TC1.0

TC2.0

TC3.0

TC4.0

TC5.0

TC6.0

TC7.0

TC8.0

TC9.0

UC1.0

X

























UC2.0




X






















UC3.0




X

X*



















UC4.0







X

X*
















UC5.0










X

X*













UC6.0













X

X*










UC7.0



















X







UC8.0






















X




UC9.0

























X