IS1024 Project Team 7

Количество страниц5
Дата09.03.2012
Размер0.72 Mb.
ТипДокументы


СодержаниеDocument History/
Table of Contents
Direct interactions with BevDOT
Requirements Workshop
List of use cases
Scope: BevDOT System Level
Scope: BevDOT Level
Scope: BevDOT System Level
Скачать 0.72 Mb.


перейти к тексту
Количество страниц5
Дата09.03.2012
Размер0.72 Mb.
ТипДокументы


СодержаниеDocument History/
Table of Contents
Direct interactions with BevDOT
4.2    Mean Time Between Failures
5.2    Database Access Response Time
7. Design Constraints
8. Documentation Requirements
8.2 Online Help
9. Scheduled Maintenance
11. System Requirements
12. Licensing, Security, and Installation
13.1 Data and Technology Variations
13.1.2 Extraction, Transformation and Validation Rules
4.1 Prioritize Use Cases
Scope: BevDOT SystemLevel
Frequency of Occurrence
Frequency of Occurrence
Frequency of Occurrence
Scope: BevDOT Level
Success Guarantee (Postcondition)
Scope: BevDOT SystemLevel
Frequency of Occurrence
1.3    References
3.1    Operating System Compliance
3.3    Help /Training
4.2    Mean Time Between Failures
5.2    Database Access Response Time
7. Design Constraints
8. Documentation Requirements
10. Applicable Standards
11. System Requirements
12. Licensing, Security, and Installation
13.1 Data and Technology Variations
13.1.2 Transformation and Validation Rules
2. 6.1 Use-case realization
8.2 Online Help
10. Applicable Standards
Actions – See steps in main scenario of Use Case UC 1.0 Input Data
Input Data
Actions – See steps in main scenario of Use Case UC 3.0 Input Data
Actions – See steps in main scenario of Use Case UC 4.0 Input Data
Actions – See steps in main scenario of Use Case UC 5.0 Input Data
Input Data
Actions – See steps in main scenario of Use Case UC 8.0 Input Data